Revit Interference Check vs Navisworks: When to Use Which
Both tools find clashes. Teams that pick the wrong one for a given moment in the project end up either running Navisworks on a single discipline’s model (overkill, slow feedback loop) or trying to run federated multi-discipline clash detection inside Revit’s Interference Check (the tool wasn’t built for it, and it shows).
What Revit Interference Check is actually for
Collaborate → Coordinate → Interference Check runs inside a single Revit session, against categories you select, within either your model or a linked model. It’s fast, needs no export step, and updates the moment you fix something — reopen the dialog and re-run.
Use it for: self-checking your own MEP model before you hand it off (duct vs pipe, pipe vs cable tray, all within your own worksets), or a quick sanity check against one architectural or structural link during active modeling.
Its limits: it does not aggregate multiple linked models well for a full federated review, has no persistent clash-tracking/assignment workflow (no “assign this clash to the mechanical engineer, mark as resolved” state), and produces a report that’s a flat list, not something you can filter/group/save as a saved search across a project’s full duration.
What Navisworks Clash Detective is actually for
Navisworks takes exported/linked models from every discipline (Revit, IFC, point clouds, whatever), runs clash tests defined between named groups of elements (not just categories), and — critically — persists clash results as a managed dataset: assign a clash to a person, mark it approved/resolved/reviewed, re-run the same test next week and see only new or still-open clashes.
Use it for: the actual weekly/biweekly multi-discipline coordination meeting, any project with 3+ disciplines linked, and any project where you need a clash log with accountability (who owns this, is it fixed) rather than just a snapshot list.
Its limits: it’s a separate application, requires exporting/appending current models each time (a workflow step people forget, leading to reviewing stale geometry), and nobody fixes anything inside Navisworks — every fix still happens back in the authoring tool, so there’s an inherent round-trip lag.
Decision table
| Situation | Use |
|---|---|
| Checking your own MEP model before issuing it | Revit Interference Check |
| Quick check against one architectural link mid-modeling | Revit Interference Check |
| Weekly multi-discipline coordination meeting | Navisworks Clash Detective |
| Need to assign clashes to people and track resolution over weeks | Navisworks Clash Detective |
| Project has only 2 linked models total | Either works; Interference Check is faster to set up |
| Project has structural, architectural, MEP (3+ disciplines) | Navisworks Clash Detective |
| Checking a headroom/soft clash with a clearance-volume tolerance | Navisworks (tolerance-based clash tests aren’t available in Interference Check) |
Common mistake
Running the full federated multi-discipline clash test inside Revit’s Interference Check by linking every discipline into one host model and checking everything against everything. Revit will do it, slowly, and the result is a flat list with no assignment/tracking workflow — meaning the same manual triage Navisworks automates gets redone by hand in a spreadsheet. If you’re linking 3+ disciplines specifically to run one big clash check, that’s the signal it’s time to move the workflow to Navisworks instead.
Frequently asked questions
- What is Revit Interference Check best used for?
- Self-checking your own discipline model before hand-off (duct vs pipe, pipe vs cable tray) or a quick sanity check against one linked model during active modeling. It runs inside Revit with no export step and updates the moment you fix something and re-run.
- When do I need Navisworks Clash Detective instead?
- For the weekly multi-discipline coordination meeting, any project with 3 or more linked disciplines, tolerance-based soft-clash tests, and whenever clashes must be assigned to people and tracked to resolution over weeks. Navisworks persists clash results as a managed dataset; Revit's tool only produces a flat snapshot list.
- Can Revit Interference Check handle a full federated clash review?
- Technically yes, but it was not built for it: it aggregates multiple links poorly, runs slowly, and has no assignment or tracking workflow, so the triage Navisworks automates gets redone by hand in a spreadsheet. Linking 3+ disciplines just to run one big check is the signal to move to Navisworks.